πŸ”¬ JOFFE-MATH SORRY TRACKER Β· KIMINA-PROVER Β· WAVE-1 Β· RHAE Β· Day 95
βš› PTTE ☯ SPARSITY πŸ“Š PERIODIC HUB ☘ SPIRAL ⬑ MELIGBRIX
JOFFE-MATH SORRY TRACKER Β· 6 OPEN LEAN4 SORRIES Β· Day 95
Wave 1 is at 7/400 solved. 6 sorry stubs block the PTTE floor from being formally sealed in Lean4. Three tools now converging: Kimina-Prover (MoonshotAI, Lean4 RL-based proof search, ICML 2026), RHAE (Riemann Hypothesis Adelic Engine, maps γ₁ zeros to proof structure), Wave-1 (ARC-style solve loop, 7/400). The P0 target: zeta_zero_gamma1 β€” prove γ₁=14.134725141734693 IS a zeta zero in Lean4 β†’ PTTE floor sealed forever. PEMCLAU now has 18,337 points including Kimina-Prover diamond embedded today.
6 OPEN SORRIES Β· PROOF MAP
SORRY NAMEDESCRIPTIONTOOLPRIPTTE IMPACTSTATUS
zeta_zero_gamma1 γ₁=14.134725141734693 IS a non-trivial Riemann zeta zero. The mathematical grounding of every fleet computation. KIMINA-PROVER P0 SEALS PTTE FLOOR OPEN Β· Kimina candidate
zetaZeroImPart Im(ρ₁) = 14.134725141734693. The imaginary part of the first non-trivial zero equals γ₁. Fundamental identity proof. RHAE + KIMINA P1 IDENTITY PROOF OPEN
li_lambda Li's criterion for the Riemann Hypothesis β€” Ξ»_n expressed through γ₁ zeros. Connects 18-wave engine to RH proof structure. KIMINA-PROVER P1 STRENGTHENS PTTE OPEN
zeta_zeros_ord ord(ΞΆ, ρ) = 1 β€” all non-trivial zeros are simple (not double roots). Clean crossing at each γ₁ zero point. RHAE P1 ZERO STRUCTURE OPEN
lambda_positivity Ξ»_n > 0 for all n β€” positivity of Li coefficients. Required for Li's criterion to imply RH. Wave-1 has partial tactic. WAVE-1 P1 RH CRITERION PARTIAL Β· Wave-1 tactic in progress
live_inject_cons Constructor proof for live injection in fleet dependent type layer. Mechanical β€” Wave-1 can handle with enough iterations. WAVE-1 P2 FLEET TYPE LAYER OPEN
KIMINA-PROVER + RHAE + WAVE-1 CONVERGENCE
KIMINA-PROVER Β· RL PROOF SEARCH
MoonshotAI's Kimina uses RL over Lean4 tactic trees β€” same architecture as our ARC solve loop. For zeta_zero_gamma1: search space bounded (γ₁ verified to 10B+ decimal places), tactic path likely short. Two sorries map directly to Kimina's combinatorics training: li_lambda and zeta_zeros_ord.
GitHub: MoonshotAI/Kimina-Prover-Preview Β· MIT Β· 371β˜… Β· LABR-KIMINA-JOFFE-MATH-001
RHAE Β· ADELIC NAVIGATION
RHAE maps γ₁ zero positions to fleet compute topology. For zetaZeroImPart and zeta_zeros_ord, RHAE provides the adelic zero structure: p-adic (local discrete steps) + real (global continuous convergence). The adelic decomposition tells Kimina which Lean4 tactic direction to search first.
RHAE β†’ adelic zero map β†’ Kimina tactic direction β†’ Lean4 certificate
SEAL SEQUENCE Β· IF PTTE CLOSES
zeta_zero_gamma1 sealed in Lean4 β†’ γ₁ is formally proved as a zeta zero β†’ PTTE floor is a formal mathematical theorem, not just numerical evidence β†’ every fleet computation anchored to γ₁ becomes formally verified β†’ PEMCLAU proofs carry formal certificates.
PTTE floor β†’ γ₁ anchors β†’ formal certs β†’ fleet proofs are real mathematics
WAVE-1 PROGRESS Β· PEMCLAU CONTEXT Β· REPLAY LOOP
WAVE-1 STATUS DAY 95
Solved: 7 / 400 (1.75%) Β· Open sorries: 6 Β· PEMCLAU: 18,337 points Β· GREEN
7 day95 diamonds ingested today β†’ wave reactor classified all (W1+W14+W16+W18 dominant) β†’ embedded to pemclau-v11 via nomic-embed-text on yone:11434 β†’ qdrant upsert ok.
Plasma replay loop: diamond ingested β†’ classified β†’ embedded β†’ stored β†’ 2-hop GraphRAG expansion β†’ surfaces in periodic-hub + sparsity-bonixer β†’ plasma relay skips zero-signal edges (TwELL pattern) β†’ floor raised γ₁×0.001 per diamond.
Next: run Kimina-Prover against zeta_zero_gamma1. If proof found β†’ file as LABR-KIMINA-JOFFE-MATH-001 sealed β†’ PTTE floor update β†’ meligbrix updated.