CLO DAY REVIEW · 2026-04-10 · EOSE LABS INC.
18-Wave Engine
18-Wave Engine · 7 ARC solves · 7 caps · v850–v873
γ₁ = 14.134725141734693
Day 66 — 18-Wave Engine live. 7 ARC solves. Gate 2 open. Wave 1 running. 7 caps deployed. 24 versions live (v850–v873).
CLO sign-off: Harvey · Amani
📋 DAY 66 LORE
DATE · WEEK
2026-04-10 · Day 66 of the fleet build · Week 10
WHAT HAPPENED
Day 66 — 18-Wave Engine live. 7 ARC solves. Gate 2 open. Wave 1 running. 7 caps deployed. 24 versions live (v850–v873).